Home
Projects
Exhibitions
Awards
Bibliography
Talks
Reviews
About
Links
Download
Contact
PDF
2 / 2
The installation as viewed on the opening of the REP theatre
Credit:
David Cotterrell (1999)
Canal
Date:
15th April 1999
Dimensions(m)
2.5, 3.0,
Categories
Installation
,
Interactive
,
Performative
,
Permanent
,
Public Realm
,
Site Specific
,
Video
Exhibitions
Birmingham Rep Redevelopment
Sponsors
Keith Williams Architects
The Birmingham Repertory Theatre